Chicago, IL

Chicago Trade Show Booth Builders & McCormick Place Exhibitor Guide

McCormick Place is the largest convention complex in North America (~2.6M sq ft). It also has the most complex union labor rules of any major US venue. This is an exhibitor's reference for McCormick EAC paperwork, crew-call economics, and finding builders that won't get you charged for surprises on Sunday move-in.

Convention centers

McCormick Place — South Building
Hall A (~840K sq ft contiguous)

Largest single contiguous hall in North America. Used for IMTS, NRA Show.

McCormick Place — North & Lakeside
Multi-level, smaller halls

Better for shows under 200K sq ft. Easier loading windows.

McCormick West
Skybridge to South Building

Hosts RSNA. Plan staffing for the walk between buildings.

Labor & union rules

Four trades govern McCormick: Teamsters (freight/material handling), Carpenters (booth assembly), Electricians (any wiring), Riggers (anything above 8 feet). Crew calls are 4-hour minimums. Overtime kicks in after 8 hours and on weekends. Mismatched trade calls are the single largest source of unbudgeted invoice surprises.

Freight, drayage & logistics

Drayage at McCormick is among the most expensive in the US. Use a local Chicago builder with warehouse space in Bensenville, Bedford Park, or Bridgeview to consolidate freight and minimize show-site labor.

Top industries & recurring shows

Industries
  • Manufacturing (IMTS, FABTECH)
  • Healthcare imaging (RSNA)
  • Restaurant equipment (NRA Show)
  • Housewares (IHHS)
  • Hardware (NHS)
Recurring shows
IMTSRSNANRA ShowFABTECHASCO

Choosing a builder in Chicago

Vet Chicago builders on McCormick EAC paperwork fluency. Ask: 'Walk me through filing the EAC packet for [my show].' A real local can answer in 60 seconds. Anyone who hedges is sending it to a third party — and you'll pay for it.

Continue planning

Beyond Chicago

Answers

Frequently asked questions

Why is McCormick Place so expensive?

Four-trade union labor with 4-hour minimum crew calls, complex EAC paperwork, and the highest drayage rates in the US compound quickly. The fix is choosing a builder that minimizes crew-call count, not crew-call rate.

What is an EAC at McCormick Place?

Exhibitor Appointed Contractor. Your booth builder must file EAC paperwork 30+ days before move-in to install your booth on the show floor instead of using the general contractor.

How much is drayage at McCormick?

Material handling typically runs $1.10–$1.60 per pound of crated freight, with higher rates for late or special-handling shipments. Always confirm whether quoted drayage is target or capped.

Can I install my own booth at McCormick Place?

Self-install is restricted. Hand-carry of small items by exhibitor staff in personal vehicles is permitted; anything requiring tools, ladders, or power generally requires union crews.

Planning a show in Chicago?

Get a free written ROI audit from a trade-show specialist before you commit budget.

Start ROI Audit